Overcoming significant engineering challenges to reinforce the distribution network, support energy security, and protect the environment

At a Glance

  • ?19.7M

    Construction Value

Location
London, England
Offices

London Area 132kv Cable System Replacement

When a distribution network operator (DNO) identified the need to replace two of their 132 kV fluid-filled cable circuits, they engaged UK construction firm Clancy to tackle the issue. Originally installed in 1959, the circuits were leaking oil and at risk of failure due to degradation. Clancy brought us onboard to produce a concept design for the replacement cable system.
?
The existing cable route, comprised of two 132 kV circuits, covered a distance of 9.6 kilometres (6 miles). Following consultations with representatives from the local government authority, a new route was agreed which extended the length to 11.2 kilometres (7 miles). This new route had to traverse an industrial zone and several residential areas¡ªand a number of significant installation challenges were present along its length. These included a dual carriageway, a tramline, a railway line, and several rail bridges under which cables needed to be installed.

To overcome these challenges, we developed a concept design for the replacement cable system which included a cable sizing study, earthing and bonding design, and cable thermo-mechanical forces calculations. We proposed ducted burial as the installation method for most of the route, with horizontal drilling recommended to cross beneath the tramline and railway. Specifications for joint bays, cable terminations, and cleating arrangements, were also produced.

Equipped with this information, the DNO and Clancy were able to move forward with replacing the older oil-filled cables with new, environmentally friendly XLPE-insulated cables.

At a Glance

  • ?19.7M

    Construction Value

Location
London, England
Offices

Meet Our Team

Sophie Lee, Transmission and Distribution Lead

The challenges faced by the energy sector are our opportunity to drive innovation in transmission and distribution and support Net Zero.

Ahmed Metwely, HV Cable Design Lead

The path to success in high-voltage cable design, as elsewhere, is paved with shared vision and collective effort.

Sophie Lee

Transmission and Distribution Lead

Ahmed Metwely

HV Cable Design Lead

We¡¯re better together

  • Become a client

    Partner with us today to change how tomorrow looks. You¡¯re exactly what¡¯s needed to help us make it happen in your community.

  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

End of main content
To top